Ballinveny Wind Farm
Site Name
Ballinveny Wind Farm
Capacity
2.55 MW
Comissioning Date
Q1 2006
Located in Co. Tipperary, Ballinveny Wind Farm is operational within the townlands of Ballinveny and Borrisnafarney. The site is located south of the village of Toomevara.
Planning permission for this site was granted by Tipperary County Council in 2001 and includes for 10 No. Conditions.
The development consists of 3 number V52 wind turbine generators and crane hardstandings for each turbine, electrical substation, underground electrical cabling, access tracks and ancillary services.
This wind farm is owned (in part) and operated by Highfield Energy as part of our broader commitment to a sustainable future.
Site Overview
Ballinveny Wind Farm
Ballinveny Wind Farm
Ballinveny Wind Farm
Ballinveny Wind Farm
1/3
3,240
tons CO2 emission saved per annum
1,600
homes powered per annum
2.55 MW
installed capacity