top of page

Ballinlough Wind Farm

Site Name

Ballinlough Wind Farm

Capacity

2.55 MW

Comissioning Date

Q1 2006

Located in Co. Tipperary, Ballinlough Wind Farm is operational within the townlands of Ballinlough and Moanmore. The site is located south of the village of Toomevara.

Planning permission for this site was granted by Tipperary County Council in 2001 and includes for 10 No. Conditions.

The development consists of 3 number V52 wind turbine generators and crane hardstandings for each turbine, electrical substation, underground electrical cabling, access tracks and ancillary services.

This wind farm is owned and operated by Highfield Energy as part of our broader commitment to a sustainable future.

Site Overview

3,240

tons CO2 emission saved per annum

1,600

homes powered per annum

2.55 MW

installed capacity
bottom of page